WP04000

Workpackage WP04000 and its subworkpackages sWP04100, sWP04200, sWP04300, sWP04400, and sWP04500 are responsible for the optical design of the telescope.

WP04000, led by THEMIS, coordinates and controls the main optical design production process and optical design tasks in compliance with general project methodology, providing feedback to the project system engineering WP03000 and managing WP01000. It defines technical requirements for the optical telescope system from the SRD. It also contributes to the general project plan and financial budget (telescope optical design part).

The different subworkpackages provide periodically information to the WP04000. Their main tasks are to:

-  define the alternatives of their subsystem in phase I of the conceptual design study,

-  lead the trade-off analysis of design alternatives in phase II,

-  specify the design and lead the analysis corresponding for the selected solution in phase III.